Autoclaved aerated Concrete equipment is not composed solely of one equipment, it is by cutting machine, jaw crusher, ball mill, pouring mixer, aluminum powder mixer, sling and mold, steaming car, pouring ferry car, autoclave, boilers and many other equipment combination, so this equipment into production to be in accordance with a certain sequence to operate, Generally speaking, autoclaved aerated concrete equipment Feeding order is according to the first slurry of materials and water, and then powdered materials, and finally cast auxiliary materials and forming materials:
1, in the use of mobile mixers, the preparation of aluminum powder should first be suspended liquid or lye into the mixer on the aluminum powder mixing tank and lye tank.
2, to the mixer into slurry-like materials, and add water, heating, in the steam heating, should pay attention to:
When adding water, you should leave a surplus.
Because the vapor has been brought into some moisture.
Furthermore, note:
Steam should be removed before the steam pipe condensate, when the use of dry grinding fly ash and no prior pulping, allow the first water and then add dry fly ash to stir.
3, input powder material calcium material, when the total amount of 50%, began to record mixing time, all finished after about 1~2min, sampling test consistency (diffusion to diameter of 50mm, high 100mm, the inner wall smoothness of the copper tube, steel pipe or plastic tube placed on the plate glass, filled with slurry after the rapid mention, Test its collapse surface diameter, before testing the inner wall and glass of the plastic pipe should be wiped with a wet cloth, injected slurry should be scraped flat, and make appropriate adjustments to be poured.
If a mobile mixer is used, the pouring car should be opened to the mold position to be injected.
4, when the autoclaved aerated concrete equipment mixing to meet the time requirements, immediately open the lye tank and aluminum powder mixer valve, the aluminum powder suspension and lye into the mixer.
When the aluminum powder stirring time, immediately began to drop the valve, to mold for pouring, and determine the casting height.
5, when finished pouring, it should be timely to fill in the process parameters of the Process Control card, do a good job.
The selection and quantity of autoclaved aerated Concrete Pipe Making Machine equipment are determined according to the process design plan, according to the process design, pouring is divided into two types: fixed type and movable type, and the cutting mode is now mainly in China with flip cutting, and other batching systems and steam curing equipments are similar.